Legal Notice
To Rome Township Property Owners: If You Are A Property Owner Within Rome Township And You Carry Flood Insurance, Please Contact The Rome Township Office As Soon As Possible With Your Name, Mailing Address, Property Address, Phone Number, And Email Information. The Office Is Open Tuesday Friday From 1:00 P.M. To 5:00 P.M.; Or Leave A Phone Message At 570-247-7373; Or Email The Information To Rometwp@Frontier.Com. The Mailing Address Is 28083 Route 187, Wysox, Pa 18854. Your Response Will Be Used By The Supervisors For Decision-Making Purposes Only. Thank You For Your Assistance In This Matter.
Priscilla Keeney
Rome Township
Secretary Treasurer
23sept,1tc
|
23 September 2014
Request for Flood Insurance Info
The following legal notice was posted in "The Daily Review" on Sept. 23rd.
18 September 2014
Drainage Improvements on Joyce Road
The Rome Township road crew was busy on Joyce Road this week correcting some drainage issues. The ditches in this section of Joyce Road were contently full of stagnant water, even during dry summers. The poor drainage in the ditches caused the road base to soften and thereby cause perpetual potholes.
Some of the drainage problems were cause by a plugged driveway culvert which blocked the ditch from draining.
With the plugged culvert replaced, the ditches on both sides were deepened and 4 inch drain lines installed below several feet of crushed stone. While the surface structure of the ditch will carry away the quick/large volume of water created by heavy rains and spring thaw, the 4 inch drain line and stone base will dry up the road base and straighten the road.
The finished drainage improvements. Great job by the township road crew.
Some of the drainage problems were cause by a plugged driveway culvert which blocked the ditch from draining.
With the plugged culvert replaced, the ditches on both sides were deepened and 4 inch drain lines installed below several feet of crushed stone. While the surface structure of the ditch will carry away the quick/large volume of water created by heavy rains and spring thaw, the 4 inch drain line and stone base will dry up the road base and straighten the road.
The finished drainage improvements. Great job by the township road crew.
Subscribe to:
Posts (Atom)